Benched walls of the former open pit with water at its base

Selebi-Phikwe.

Former open pit, Selebi-Phikwe, BotswanaPhotographed August 2026

A mine and smelter for more than forty years.

Construction of the plant and the sinking of the shafts began at Selebi-Phikwe in 1970, and the concentrator started up in 1973. For more than forty years the operation mined nickel and copper ore and smelted it on site.

Production stopped in October 2016, when the operating company was placed in liquidation. The liquidator has since sold the site's assets in parts.

The site in dates.

  1. 1970

    Construction of the plant begins, alongside the sinking of the shafts.

  2. 1973

    The concentrator starts up.

  3. 2016

    In October, operations stop and the operating company goes into liquidation.

  4. 2023

    Mine2Market begins work on legacy material at the site.

  5. 2026

    Mine2Market completes the purchase of 28 intermediate dumps.

Stockpiles, bagged material and haul roads at the Selebi-Phikwe site, seen from above
The site from above, October 2026.

What was left above ground.

Over those decades, material that did not suit the plant or the prices of the day was stockpiled, spilled or set aside around the works. Mine2Market holds 28 of these intermediate dumps.

Material on site

  • Nickel-copper sulphide concentrates
  • Nickel-copper matte and smelter reverts
  • Plant lockups, knockouts and spillages
  • Historic concentrate stockpiles and pond residues
  • Intermediate dump material
A piece of weathered, mineralised rock from the site held in the hand
Material from the site, December 2025.
Mounds of stockpiled material in front of a dark dump hill at the Selebi-Phikwe site
Legacy material at Selebi-Phikwe, December 2025.

Enquiries.

enquiries@mine2market.com

Investors

Tell us what you need to see. Detailed technical and commercial information is shared under confidentiality.

Metal buyers

Tell us the material and specification you are looking for, and where you take delivery.